{"id":225943,"date":"2019-05-19T16:27:28","date_gmt":"2019-05-19T23:27:28","guid":{"rendered":"http:\/\/www.seattleeva.org\/wp\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/"},"modified":"2019-05-19T16:27:28","modified_gmt":"2019-05-19T23:27:28","slug":"mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility","status":"publish","type":"post","link":"https:\/\/www.seattleeva.org\/wp\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/","title":{"rendered":"Mullen Technologies\u2019 Qiantu K50 EV to be built in Spokane facility"},"content":{"rendered":"<p><span style=\"font-style:italic;font-size:16px\">By  <a target=\"_blank\" href=\"https:\/\/chargedevs.com\/newswire\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/\">Paul Beck<\/a><\/span>  EV manufacturer Mullen Technologies has signed a Letter of<br \/>\nIntent with the West Plains Airport Area Public Development Authority (PDA) to<br \/>\nbuild a new manufacturing facility in Spokane County, Washington. The 1.3<br \/>\nmillion square foot facility will produce Mullen&#8217;s Qiantu K50 sports coupe EV.<\/p>\n<p>The facility will be built by the PDA and leased <a href=\"https:\/\/chargedevs.com\/newswire\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/\" target=\"_blank\" id=\"rssmi_more\" rel=\"noopener noreferrer\"> &#8230;read more<\/a> <\/p>\n<p>Source:: <a href=\"https:\/\/chargedevs.com\/newswire\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/\" target=\"_blank\" title=\"Mullen Technologies\u2019 Qiantu K50 EV to be built in Spokane facility\" rel=\"noopener noreferrer\">https:\/\/chargedevs.com\/newswire\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>EV manufacturer Mullen Technologies has signed a Letter of<br \/>\nIntent with the West Plains Airport Area Public Development Authority (PDA) to<br \/>\nbuild a new manufacturing facility in Spokane County, Washington. The 1.3<br \/>\nmillion square foot facility will produce Mullen&#8217;s Qiantu K50 sports coupe EV.<\/p>\n<p>The facility will be built by the PDA and leased <a href=\"https:\/\/chargedevs.com\/newswire\/mullen-technologies-qiantu-k50-ev-to-be-built-in-spokane-facility\/\" target=\"_blank\" id=\"rssmi_more\" rel=\"noopener noreferrer\"> &#8230;read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[46],"tags":[],"class_list":["post-225943","post","type-post","status-publish","format-standard","hentry","category-charged-magazine"],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/posts\/225943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/comments?post=225943"}],"version-history":[{"count":0,"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/posts\/225943\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/media?parent=225943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/categories?post=225943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.seattleeva.org\/wp\/wp-json\/wp\/v2\/tags?post=225943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}